High Tech Projects

< vorige   | 1 2 3 4 5 |   volgende >

Vogel’s - Demand planning & collaboration improvement

vogels

Redesign of the demand planning process by better use of statistical forecast and focusing on main items and main customers to improve forecast accuracy. Vogel’s, top supplier ...
EyeOn   |   November 08, 2010   |   High tech

Philips Luminaires / Massive - Fix the planning basics

philips

Philips Consumer Luminaires was in fire-fighting mode until we joined them to create structure and clarity in their operations. The company was in strong need to fix some of the basics: ...
EyeOn   |   October 18, 2010   |   High tech

ASML - Implementation of a tool and process to manage hardware upgrades

asml

Implementation of a tool and process to manage hardware upgrades during production for High Tech equipment The equipment of this customer is becoming more and more complex i.e. more ...
EyeOn   |   August 09, 2010   |   High tech

ASML - Interim+ Logistics engineer Planning & control

asml

Coordinate, organize & control all logistical and administrative flows of pre-owned systems. Monitor, report and analyze manufacturing activities of all pre-owned systems.   ...
EyeOn   |   August 02, 2010   |   High tech

Philips Luminaires / Massive - Demand Management

philips

We helped Philips Consumer Luminaires to sense market demand and capture it to use it for their benefit. Sales organizations all across Europe were asked to do the sheer impossible: ...
EyeOn   |   July 20, 2010   |   High tech

< vorige   | 1 2 3 4 5 |   volgende >
Share this page  LinkedIn icoon Twitter icoon Facebook icoon